108″ MOTORISED 16:10 PROJECTOR SCREEN WITH LONG LEADER TENSI ONED AERIE TENSION

Sale!

108″ MOTORISED 16:10 PROJECTOR SCREEN WITH LONG LEADER TENSI ONED AERIE TENSION

Original price was: $3,669.00.Current price is: $2,845.71.

 

Found a better price? Contact us today and let us see if we can beat it.

 

 

SKU: ARE108XW3-E24 Category:

Product Info

Aerie Tension 108″ Recessed In-ceiling Electric 16:10 Motorized Projector Screen Elite Screens ARE108XW3-E24 EliteScreens

Elite Screens Aerie Tension ARE108XW3-E24 108″ 16:10 In-ceiling Tensioned Powered Screen is the perfect solution for concealed in-ceiling Home Theater, ProAV, and Custom Installation.

 

CineWhite

CineWhite has broad light dispersion through diffusion uniformity, black & white contrast and true color rendition making it the most versatile material in Elite’s tension screen product lines. This tension PVC surface is the best choice for today’s high-contrast ratio projector in commercial or residential presentations. The CineWhite™ matte white material equals the performance to our MaxWhite product, but improves the experience with superior surface flatness. Uniform diffusion surface has black-backing to eliminate light penetration and is easily washable with mild soap and water.

 

Screen Material

  • Award winning CineWhite 1.1 Gain black backed matte white screen material
  • 160º wide-viewing angle
  • Tab-tension cords provide uniform flatness on entire projection surface
  • Available in various diagonal sizes and aspect ratios
  • Optional custom sizes and materials available thru our Custom Screen Request Order Form

 

Design and Installation

  • Disappearing in-ceiling design for non-dedicated media rooms
  • Integrated ceiling projection screen ships fully assembled, ready to install
  • Aluminum housing with white finish is strong and moisture resistant
  • Below and above ceiling access installation design
  • Instllation kit included

 

Control System

  • Internal Radio Frequency/Infrared receivers with IR, RF remotes included
  • Low voltage 3-way wall switch and in-wall RJ45 module included
  • Standard 5-12 volt trigger to synchronize screen operation with the projector’s power cycle

 

Quality and Reliability

  • ETL, FCC, CE, CB GOSTCE & ISO9001:2008
  • Conforms to UL 2043 – Plenum Rated: Suitable for air-handling spaces

Model # Nominal Diagonal Aspect Ratio View Height (in) View Width (in) View Height (cm) View Width (cm) Top Black Border Gain
ARE84VW3-E30 84" 4:3 50.4 67.2 128.0 170.7 30" 1.1
ARE100VW3-E20 100" 4:3 60.0 80.0 152.4 203.2 20" 1.1
ARE120VW3-E10 120" 4:3 72.0 96.0 182.9 243.8 10" 1.1
ARE84HW3-E30 84" 16:9 41.2 73.2 104.6 185.9 30" 1.1
ARE100HW3-E24 100" 16:9 49.1 87.2 124.7 221.5 24" 1.1
ARE106HW2-E24 106" 16:9 52.0 92.4 132.1 234.7 24" 1.1
ARE120HW3-E20 121" 16:9 58.8 104.6 149.4 265.7 20" 1.1
ARE135HW3-E12 135" 16:9 66.2 117.7 168.1 299.0 12" 1.1
ARE108XW3-E24 108" 16:10 57.2 91.5 145.3 232.4 24" 1.1
ARE114XW3-E20 114" 16:10 60.4 96.6 153.4 245.4 20" 1.1
ARE126XW3-E14 126" 16:10 66.8 106.8 169.5 271.3 14" 1.1
ARE94XW3-E30 94" 16:10 49.8 79.7 126.5 202.4 30" 1.1
ARE139XW3-E8 139" 16:10 73.6 117.8 186.9 299.2 8" 1.1