114″ MOTORISED 16:10 PROJECTOR SCREEN WITH LONG LEADER TENSI ONED AERIE TENSION
Product Info
Aerie Tension 114″ Recessed In-ceiling Electric 16:10 Motorized Projector Screen Elite Screens ARE114XW3-E20 EliteScreens
Elite Screens Aerie Tension ARE114XW3-E20 114″ 16:10 In-ceiling Tensioned Powered Screen is the perfect solution for concealed in-ceiling Home Theater, ProAV, and Custom Installation.
CineWhiteCineWhite has broad light dispersion through diffusion uniformity, black & white contrast and true color rendition making it the most versatile material in Elite’s tension screen product lines. This tension PVC surface is the best choice for today’s high-contrast ratio projector in commercial or residential presentations. The CineWhite™ matte white material equals the performance to our MaxWhite product, but improves the experience with superior surface flatness. Uniform diffusion surface has black-backing to eliminate light penetration and is easily washable with mild soap and water.
Screen Material
- Award winning CineWhite 1.1 Gain black backed matte white screen material
- 160º wide-viewing angle
- Tab-tension cords provide uniform flatness on entire projection surface
- Available in various diagonal sizes and aspect ratios
- Optional custom sizes and materials available thru our Custom Screen Request Order Form
Design and Installation
- Disappearing in-ceiling design for non-dedicated media rooms
- Integrated ceiling projection screen ships fully assembled, ready to install
- Aluminum housing with white finish is strong and moisture resistant
- Below and above ceiling access installation design
- Instllation kit included
Control System
- Internal Radio Frequency/Infrared receivers with IR, RF remotes included
- Low voltage 3-way wall switch and in-wall RJ45 module included
- Standard 5-12 volt trigger to synchronize screen operation with the projector’s power cycle
Quality and Reliability
- ETL, FCC, CE, CB GOSTCE & ISO9001:2008
- Conforms to UL 2043 – Plenum Rated: Suitable for air-handling spaces




