120″ MOTORISED 16:9 PROJECTOR SCREEN WITH LONG LEADER TENSIO NED AERIE TENSION
Product Info
Aerie Tension 120″ Recessed In-ceiling Electric 16:9 Motorized Projector Screen Elite Screens ARE120HW3-E20 EliteScreens
Elite Screens Aerie Tension ARE120HW3-E20 120″ 16:9 In-ceiling Tensioned Powered Screen is the perfect solution for concealed in-ceiling Home Theater, ProAV, and Custom Installation.
CineWhite
CineWhite has broad light dispersion through diffusion uniformity, black & white contrast and true color rendition making it the most versatile material in Elite’s tension screen product lines. This tension PVC surface is the best choice for today’s high-contrast ratio projector in commercial or residential presentations. The CineWhite™ matte white material equals the performance to our MaxWhite product, but improves the experience with superior surface flatness. Uniform diffusion surface has black-backing to eliminate light penetration and is easily washable with mild soap and water.
Screen Material
- Award winning CineWhite 1.1 Gain black backed matte white screen material
- 160º wide-viewing angle
- Tab-tension cords provide uniform flatness on entire projection surface
- Available in various diagonal sizes and aspect ratios
- Optional custom sizes and materials available thru our Custom Screen Request Order Form
Design and Installation
- Disappearing in-ceiling design for non-dedicated media rooms
- Integrated ceiling projection screen ships fully assembled, ready to install
- Aluminum housing with white finish is strong and moisture resistant
- Below and above ceiling access installation design
- Instllation kit included
Control System
- Internal Radio Frequency/Infrared receivers with IR, RF remotes included
- Low voltage 3-way wall switch and in-wall RJ45 module included
- Standard 5-12 volt trigger to synchronize screen operation with the projector’s power cycle
Quality and Reliability
- ETL, FCC, CE, CB GOSTCE & ISO9001:2008
- Conforms to UL 2043 – Plenum Rated: Suitable for air-handling spaces
| Model # | Nominal Diagonal | Aspect Ratio | View Height (in) | View Width (in) | View Height (cm) | View Width (cm) | Top Black Border | Gain |
| ARE84VW3-E30 | 84" | 4:3 | 50.4 | 67.2 | 128.0 | 170.7 | 30" | 1.1 |
| ARE100VW3-E20 | 100" | 4:3 | 60.0 | 80.0 | 152.4 | 203.2 | 20" | 1.1 |
| ARE120VW3-E10 | 120" | 4:3 | 72.0 | 96.0 | 182.9 | 243.8 | 10" | 1.1 |
| ARE84HW3-E30 | 84" | 16:9 | 41.2 | 73.2 | 104.6 | 185.9 | 30" | 1.1 |
| ARE100HW3-E24 | 100" | 16:9 | 49.1 | 87.2 | 124.7 | 221.5 | 24" | 1.1 |
| ARE106HW2-E24 | 106" | 16:9 | 52.0 | 92.4 | 132.1 | 234.7 | 24" | 1.1 |
| ARE120HW3-E20 | 121" | 16:9 | 58.8 | 104.6 | 149.4 | 265.7 | 20" | 1.1 |
| ARE135HW3-E12 | 135" | 16:9 | 66.2 | 117.7 | 168.1 | 299.0 | 12" | 1.1 |
| ARE108XW3-E24 | 108" | 16:10 | 57.2 | 91.5 | 145.3 | 232.4 | 24" | 1.1 |
| ARE114XW3-E20 | 114" | 16:10 | 60.4 | 96.6 | 153.4 | 245.4 | 20" | 1.1 |
| ARE126XW3-E14 | 126" | 16:10 | 66.8 | 106.8 | 169.5 | 271.3 | 14" | 1.1 |
| ARE94XW3-E30 | 94" | 16:10 | 49.8 | 79.7 | 126.5 | 202.4 | 30" | 1.1 |
| ARE139XW3-E8 | 139" | 16:10 | 73.6 | 117.8 | 186.9 | 299.2 | 8" | 1.1 |




