135″ MOTORISED 16:9 PROJECTOR SCREEN WITH LONG LEADER TENSIO NED AERIE TENSION
Product Info
135″ MOTORISED 16:9 PROJECTOR SCREEN WITH LONG LEADER TENSIO NED AERIE TENSION
BULK FREIGHT WILL BE CALCULATED BASED ON DELIVERY LOCATION AND BOX LENGTH, PLEASE ENQUIRE FREIGHT BEFORE PLACING ORDER
Elite Screens Aerie Tension ARE135HW3-E12 135″ 16:9 In-ceiling Tensioned Powered Screen is the perfect solution for concealed in-ceiling Home Theater, ProAV, and Custom Installation.
CineWhite
CineWhite has broad light dispersion through diffusion uniformity, black & white contrast and true color rendition making it the most versatile material in Elite’s tension screen product lines. This tension PVC surface is the best choice for today’s high-contrast ratio projector in commercial or residential presentations. The CineWhite™ matte white material equals the performance to our MaxWhite product, but improves the experience with superior surface flatness. Uniform diffusion surface has black-backing to eliminate light penetration and is easily washable with mild soap and water.
Screen Material
- Award winning CineWhite 1.1 Gain black backed matte white screen material
- 160º wide-viewing angle
- Tab-tension cords provide uniform flatness on entire projection surface
- Available in various diagonal sizes and aspect ratios
- Optional custom sizes and materials available thru our Custom Screen Request Order Form
Design and Installation
- Disappearing in-ceiling design for non-dedicated media rooms
- Integrated ceiling projection screen ships fully assembled, ready to install
- Aluminum housing with white finish is strong and moisture resistant
- Below and above ceiling access installation design
- Instllation kit included
Control System
- Internal Radio Frequency/Infrared receivers with IR, RF remotes included
- Low voltage 3-way wall switch and in-wall RJ45 module included
- Standard 5-12 volt trigger to synchronize screen operation with the projector’s power cycle
Quality and Reliability
- ETL, FCC, CE, CB GOSTCE & ISO9001:2008
- Conforms to UL 2043 – Plenum Rated: Suitable for air-handling spaces




