150″ MOTORISED 4:3 PROJECTOR SCREEN WITH LONG LEADER 12V TRIGGER & SWITCH VMAX2

Sale!

150″ MOTORISED 4:3 PROJECTOR SCREEN WITH LONG LEADER 12V TRIGGER & SWITCH VMAX2

Original price was: $2,399.00.Current price is: $1,861.43.

 

Found a better price? Contact us today and let us see if we can beat it.

 

 

SKU: VMAX150XWV2-E24 Category:

Product Info

VMAX2 150″ Electric 4:3 1.1 Gain Motorized Projector Screen Elite Screens VMAX150XWV2-E24 EliteScreens

 

  • Durable all-metal casing for wall & ceiling installation
  • Max White FG 1.1 gain matte material is durable and easy to clean and has a 160 degree wide viewing angle
  • Synchronized motor for silent operation with extended operational longevity and low power consumption
  • Internal IR/RF receiver eliminates the need for a wall box
  • Easy control by either low voltage 3-way wall box, radio frequency (RF) remote, infrared (IR) remote or the Internal 12 volt trigger which enables drop/rise cycle to synchronize with the projector’s power cycle
  • 150″ diagonal size with 4:3 Aspect Ratio
  • Extra 24″ Top Black Masking for high-wall or in-ceiling mounting
  • 2 Years Manufacturer’s Warranty

 

  • MaxWhite FiberGlass backed 1.1 Gain material
  • 160° wide viewing angle
  • Standard 4-side black masking borders
  • Matte White material is durable and easy to clean

Total Control

  • Standard Infrared (IR) remote control
  • Detachable 3-way wall switch
  • Includes Radio Frequency (RF) remote to operate from up to 100 feet away without the necessity of line of sight
  • Built-in 5-12 volt trigger input enables Drop/Rise operation to synchronize with the projector’s power cycle
  • Low-voltage internal IR/RF receivers
  • CAT5 cable wit RJ-45 connector for easy extension of the 5-12 volt trigger/IR “eye”receiver/3-way wall switch
  • Optional ZR800D IR Universal Remote Control, wireless 5-12 volt trigger, Universal 5-12 volt trigger (for projectors that don’t have a trigger ouput port) and In-wall switch

Installation

  • Durable metal casing for wall/ceiling installation
  • Bubble leveler included
  • Ships fully assembled with 3-prong power connection ready to plug & play
  • Optional in-ceiling trim kit and 6″ & 12″ L brackets

Quality and Reliability

  • Synchronous motor allows silent operation with extended operational longevity and low power consumption
  • Certified by AMX and CRESTRON
  • GREENGUARD® Indoor Air Quality and GREENGUARD® Children & Schools Certified

 

 

 

Please note: This screen is not suitable for Ultra Short Throw projectors. For UST projectors, we recommend fixed or tensioned manual and tensioned electric screens only. Please contact us for more information.

Product Type: VMAX2
Screen Material: MaxWhite FG
Screen Format: Standard (4:3)
Nominal Diagonal: 150"
Viewing Dimensions: 2286mm H x 3048mm W
Gain: 1.1
Viewing Angle: 160 Degrees
Metal Casing: White

Drop: 24" Top Black Masking

Please note: This screen is not suitable for Ultra Short Throw projectors. For UST projectors, we recommend fixed or tensioned manual and tensioned electric screens only. Please contact us for more information.
Brochure Download
User Guide Download
White Paper Download
Dimensions Table Download
Product Drawing Download
Parts List Diagram Download
Motor Wiring Diagram-220v Download
Dry Contact Connection Download
MaxWhite Material Sheet Download

 

Elite Screens VMAX150XWV2-E24 150" Electric Screen video 1 of 2

 

Elite Screens VMAX150XWV2-E24 150" Electric Screen video 2 of 2
Please note: This screen is not suitable for Ultra Short Throw projectors. For UST projectors, we recommend fixed or tensioned manual and tensioned electric screens only. Please contact us for more information.