84″ MOTORISED 4:3 PROJECTOR SC REEN WITH LONG LEADER TENSIONE D AERIE TENSION

Sale!

84″ MOTORISED 4:3 PROJECTOR SC REEN WITH LONG LEADER TENSIONE D AERIE TENSION

Original price was: $2,899.00.Current price is: $2,248.57.

 

Found a better price? Contact us today and let us see if we can beat it.

 

 

SKU: ARE84VW3-E30 Category:

Product Info

84″ MOTORISED 4:3 PROJECTOR SC REEN WITH LONG LEADER TENSIONE D AERIE TENSION

BULK FREIGHT WILL BE CALCULATED BASED ON DELIVERY LOCATION AND BOX LENGTH, PLEASE ENQUIRE FREIGHT BEFORE PLACING ORDER

Elite Screens Aerie Tension ARE84VW3-E30 84″ 4:3 In-ceiling Tensioned Powered Screen is the perfect solution for concealed in-ceiling Home Theater, ProAV, and Custom Installation.

CineWhite

CineWhite has broad light dispersion through diffusion uniformity, black & white contrast and true color rendition making it the most versatile material in Elite’s tension screen product lines. This tension PVC surface is the best choice for today’s high-contrast ratio projector in commercial or residential presentations. The CineWhite™ matte white material equals the performance to our MaxWhite product, but improves the experience with superior surface flatness. Uniform diffusion surface has black-backing to eliminate light penetration and is easily washable with mild soap and water.

 

Screen Material

  • Award winning CineWhite 1.1 Gain black backed matte white screen material
  • 160º wide-viewing angle
  • Tab-tension cords provide uniform flatness on entire projection surface
  • Available in various diagonal sizes and aspect ratios
  • Optional custom sizes and materials available thru our Custom Screen Request Order Form

 

Design and Installation

  • Disappearing in-ceiling design for non-dedicated media rooms
  • Integrated ceiling projection screen ships fully assembled, ready to install
  • Aluminum housing with white finish is strong and moisture resistant
  • Below and above ceiling access installation design
  • Instllation kit included

 

Control System

  • Internal Radio Frequency/Infrared receivers with IR, RF remotes included
  • Low voltage 3-way wall switch and in-wall RJ45 module included
  • Standard 5-12 volt trigger to synchronize screen operation with the projector’s power cycle

 

Quality and Reliability

  • ETL, FCC, CE, CB GOSTCE & ISO9001:2008
  • Conforms to UL 2043 – Plenum Rated: Suitable for air-handling spaces