94″ MOTORISED 16:10 PROJECTOR SCREEN WITH LONG LEADER TENSIO NED AERIE TENSION

Sale!

94″ MOTORISED 16:10 PROJECTOR SCREEN WITH LONG LEADER TENSIO NED AERIE TENSION

Original price was: $3,349.00.Current price is: $2,598.57.

 

Found a better price? Contact us today and let us see if we can beat it.

 

 

SKU: ARE94XW3-E30 Category:

Product Info

94″ MOTORISED 16:10 PROJECTOR SCREEN WITH LONG LEADER TENSIO NED AERIE TENSION

BULK FREIGHT WILL BE CALCULATED BASED ON DELIVERY LOCATION AND BOX LENGTH, PLEASE ENQUIRE FREIGHT BEFORE PLACING ORDER

Elite Screens ARE94XW3-E30

Elite Screens Aerie Tension ARE94XW3-E30 94″ 16:10 In-ceiling Tensioned Powered Screen is the perfect solution for concealed in-ceiling Home Theater, ProAV, and Custom Installation.

Key Specifications:

  • Award winning CineWhite 1.1 Gain black backed matte white screen material
  • 160¼ wide-viewing angle
  • Tab-tension cords provide uniform flatness on entire projection surface
  • Available in various diagonal sizes and aspect ratios
  • Optional custom sizes and materials
  • Disappearing in-ceiling design for non-dedicated media rooms
  • Integrated ceiling projection screen ships fully assembled, ready to install
  • Aluminium housing with white finish is strong and moisture resistant
  • Below and above ceiling access installation design
  • Installation kit included
  • Internal Radio Frequency/Infrared receivers with IR, RF remotes included
  • Low voltage 3-way wall switch and in-wall RJ45 module included